Licensing Issues for PEC Power Plant in Vasilikos
February 26, 2025
The Auditor General's report reveals that the PEC power plant in Vasilikos lacks the necessary permits to operate, as part of its infrastructure has been built on land not owned by the company. This results in the nullification of even the initial zoning permit obtained. Furthermore, the report documents the ongoing tolerance of state services for legal violations related to the project. The General Director of the Ministry of Interior is criticized for attempts to retroactively legalize the facility's constructions.